Customer Stories
COMING SOON – We take immense pride in seeing our Hydraulic Solutions excel under challenging conditions! Browse for inspiration through our Powering Innovation success stories, for Lifting, Heavy Lifting and Transportation, Rerailing, Cutting and Service, shared by our Customers.
Heavy Lifting & Transportation
Lifting, holding and lowering bridge construction
Lifting, holding and lowering a bridge construction to make bridge bearing adjustments. Commissioned by Meccanico, Holmatro supplied a flexible, easy to handle and extremely accurate synchronized lifting system.
Heavy Lifting & Transportation
Installing winches and cable drums below deck in very limited space
Commissioned by Allseas, Holmatro supplied an extremely low and lightweight Skidding System that is easy to handle and install, without the use of a forklift or additional tools.
Heavy Lifting & Transportation
Lifting heavy objects at difficult accessible locations
Lifting transformers up to 500 mm at difficult accessible locations. Commissioned by Mammoet, Holmatro supplied 85 ton aluminum cylinders and stacking rings.
Heavy Lifting & Transportation
Transformer safely jacked and skidded into position at Knowl Hill Substation
31 Tonne transformer jacked and skidded from Winder Power in Leeds to Knowl Hill, Berkshire. Collett’s Team used the Holmatro Skidding system and four Holmatro hydraulic cylinders.
Heavy Lifting & Transportation
Moving a 30 tonnes blow molding machine
Commissioned by TKM Turnkey Movement, Holmatro supplied lifting equipment, like toe cylinders, a FlowPanel and a hand pump. The Holmatro equipment makes sure TKM is ready for the near future.
Demolition
Demolition
In demolition, you can come across a hundred and more materials that need to be removed from all sorts of buildings and constructions. Very suitable for demolition applications and for handling the most diverse materials are Holmatro’s cutters with short and standard blades. The standard blade is ideal for cutting bigger elements because of the U-shape, which pulls the material towards the strongest point of the cutter. The short blade is more suitable in those situations when less space is available, whereas a high cutting force is required.
Civil Engineering & Construction
Lifting and securing a soccer stadium roof
Lifting and securing the roof of the Rhein stadium in Dusseldorf for repair work. Commissioned by Verwater, Holmatro supplied 250 ton locknut cylinders.
Civil Engineering & Construction
Lifting construction at 80 meters height
Lifting a bridge construction at 80 meters height with a lifting force of 1200 tonnes to replace bridge bearings. Commissioned by Bechtel-Enka, Holmatro supplied 100 tonnes single-acting locknut cylinders.
Civil Engineering & Construction
Jacking up the A12 viaduct
Lifting a viaduct over the A12 highway to replace the bearing pads under the box girders. Commissioned by Spanbeton, Holmatro supplied 150 tonnes locknut cylinders.
Civil Engineering & Construction
Jacking up office tower foundation
Jacking of the outer columns of a 130 meter high office tower due to uneven settlement caused by weight differences. Commissioned by CT de Boer, Holmatro supplied 400 ton locknut cylinders.
Civil Engineering & Construction
Foundation engineering
Anchoring a quay wall with a retaining height of over 20 metres. Commissioned by Jetmix, Holmatro supplied a 400 ton hollow plunger cylinder.
Civil Engineering & Construction
Lifting a construction shed at great height
Lifting the construction shed, to its position on top of the fourth level of the Erasmus Medical Centre office tower, is a huge job that has to be done with precision. Commissioned by BAM/Ballast Nedam, Holmatro supplied double-action, high tonnage cylinders.