Situation

JSC Antipinsky Refinery was founded in July 2004 on the territory of one of the major oil and gas producing regions within the Russian Federation - The Tyumen Region, where most of Russian oil (64%) and natural gas (91%) reserves are concentrated.  For the Antipinsky Oil Refinery,  Instar Logistics transported pipe modules with a size of 35x8x8 meters and a weight of 200 tons.

Challenge

On site at the Antipinsky Oil Refinery, the pipe modules needed to be transported and positioned.

Solution

Instar used a synchonized positioning system with six 150 ton aluminium cylinders in combination with a skid system.

Holmatro’s Skid Systems are suitable for moving industrial objects and installations of exceptional size and weight, to locations where using a crane is not an option. Due to the user-friendly modular construction of both systems they can be easily adapted for each load size and project.

Read more about the Skid System >

Computer-controlled synchronized positioning of heavy loads, with high damage risk, has never been so easy with the Holmatro Synchronized Positioning System. Thanks to the multiple-split-flow pumps, each lifting point has its own single oil flow whereby the load can be positioned smoothly and with extreme precision.

Read more about the Synchronized Positioning System >