Rail tunnel construction

Rail tunnel construction

(Tool deployed : Synchronized Positioning System)

Situation

Rail tunnel construction

During the construction of a new rail tunnel in the center of Brussels, rail casings were produced on site and then lifted in order to be able to place bridge supports underneath them. This was carried out with the Synchronized Positioning System developed in cooperation with our cutomer and delivered by Holmatro.

Advanced combination high-pressure hydraulics and digital control

Rail tunnel construction

This system is a combination of high-pressure hydraulics and digital control. The software creates an intuitive configuration and ensures extremely safe operation. Feedback from multiple sensors in the system is immediately converted into extremely accurate control of the pumps. The mobile pump units can also be operated separately and manually if necessary or desired. Besides the basic functionalities of positioning, aligning, lifting, lowering and weighing, the system is suitable for tilting applications and it is also possible to work with step cylinders instead of standard cylinders.

Synchronized Positioning System >